About the Project
Contract included on-site calibrations of all process instrumentation and control valves for the Michelin Tire Manufacturing Facility. In addition, Mundial Group controlled and coordinated the turnover of the calibrated instrumentation to the installation contractor. Mundial Group performed field QA/QC of all instrumentation to confirm proper installation per design and manufacturers requirements. Discrepancies were recorded and reviewed with the installing contractors to resolve. Mundial Group provided 3rd party witness verification of the system checkout and loop functionality testing performed by the Systems Integration Contractor.
Explore More Case Studies
-
Operational & Functional Acceptance TestingControl System Pre-Commissioning
Sparks, NVContract includes pre-commissioning (OAT) support for HVAC and Process Control Systems throughout the current factory buildout.
-
Instrument CommissioningI&C Superintendents and Field Engineers
Sparks, NVMundial Group is providing augmented staffing to perform construction superintendent duties associated with the construction of the factory expansion project.