Case Study
AOP Water System Pre-Commissioning
About the Project
Contract included pre-commissioning (OAT) support for 4 AOP (Advanced Oxidization Process) Systems. Mundial Group prepared the OAT documentation for each I/O point. Proper device wiring, labeling, terminations, tagging, installation location and correctness of installation were all field verified per the design documents. Discrepancies were recorded, reported and reviewed with the installing contractor to revise and correct deficiencies. Upon completion of field review, individual I/O were tested and simulated through the PLC/SCADA system to confirm function.
Explore More Case Studies
-
Operational & Functional Acceptance TestingControl System Pre-Commissioning
Sparks, NVContract includes pre-commissioning (OAT) support for HVAC and Process Control Systems throughout the current factory buildout.
-
Instrument CommissioningI&C Superintendents and Field Engineers
Sparks, NVMundial Group is providing augmented staffing to perform construction superintendent duties associated with the construction of the factory expansion project.