Case Study
Boeing 777X Project
About the Project
Mundial Group is contracted to provide support for this Boeing 777X Wing Fabrication Facility. Duties include management of vendors performing point to point checkout, pre-commissioning and test and balance of the HVAC and Utility Systems. Our staff has been responsible for starting, operating and maintaining early run equipment such as Air Handlers, Chillers and Boilers. Mundial Group managed the installation of instrumentation associated with the Autoclave unit and assisted with pre-commissioning and start-up of the associated systems.
Explore More Case Studies
-
Operational & Functional Acceptance TestingControl System Pre-Commissioning
Sparks, NVContract includes pre-commissioning (OAT) support for HVAC and Process Control Systems throughout the current factory buildout.
-
Instrument CommissioningI&C Superintendents and Field Engineers
Sparks, NVMundial Group is providing augmented staffing to perform construction superintendent duties associated with the construction of the factory expansion project.