Case Study

Boeing 777X Project


Industry

Aerospace

Service

Instrument Commissioning

Location

Everett, WA

About the Project

Mundial Group is contracted to provide support for this Boeing 777X Wing Fabrication Facility. Duties include management of vendors performing point to point checkout, pre-commissioning and test and balance of the HVAC and Utility Systems. Our staff has been responsible for starting, operating and maintaining early run equipment such as Air Handlers, Chillers and Boilers. Mundial Group managed the installation of instrumentation associated with the Autoclave unit and assisted with pre-commissioning and start-up of the associated systems.

Explore More Case Studies